Validity and the Regression-Discontinuity (RD) Design
Quiz
1. Why is this design called the regression-discontinuity design?
The name comes from the "jump" or discontinuity observed in the
regression line.
The design is a return to an earlier, more primitive state with an unnatural
shift in the process.
![]()
![]()
Copyright © 1997, Rosemary Walkley, All Rights Reserved